Paste measurements straight from your spreadsheet. The studio draws the control charts, flags the points that break the run rules, calculates Cp, Cpk, Pp and Ppk with the ppm out of tolerance, checks your gauge with a Gauge R&R study and designs the sampling plan.
Excel paste, decimal commas
Nelson and Western Electric rules
60 industry quick starts
English, French, Arabic
171typical characteristics across 60 industries
7control charts: X-bar/R, X-bar/S, I-MR, p, np, c, u
24chart constants computed by integration (subgroups 2 to 25)
It replaces the routine statistics work of a quality engineer: control charts with signals, a customer-ready capability report, a measurement system study and an acceptance sampling plan, all from your own numbers and all in the browser.
What you need
The specification limits of each characteristic (from the drawing or the contract), and measurements taken in time order: at least 25 subgroups of 3 to 5 parts, or 100 single readings. For the gauge study, 10 parts measured two or three times by two or three people.
Where the maths comes from
Published methods: the NIST e-Handbook for control limits, capability and the Anderson-Darling test, the Nelson and Western Electric run rules, crossed ANOVA and the average-range method for Gauge R&R. Sampling plans are computed from the binomial and hypergeometric distributions, not copied from a standard.
How to get a reliable result
Keep the readings in time order, make subgroups of parts made close together, and check stability first: a capability index is only meaningful when the charts show no signals. Check the gauge before blaming the process.
How to read the report
Part A shows the charts and every signal with its likely cause. Part B gives Cp, Cpk, Pp, Ppk, ppm and a verdict. Part C judges the gauge (under 10% of the variation is good, over 30% is not acceptable). Part D gives the sample size and acceptance number. Part E lists what to do first.
Limits
Non-normal data are flagged, not transformed (a non-parametric index appears from 100 values). The quick-start data are illustrations: replace them with your measurements. The studio supports your decision, it does not replace the judgement of your customer or your quality system.
Questions
Can I paste from Excel?
Yes. Copy the cells and paste them into the box of the characteristic. Tabs, semicolons, commas and spaces are understood, with a decimal point or a decimal comma. A header line and a first column of labels are ignored.
Which chart will it use?
Measurements get X-bar and R for subgroups of 2 to 10, X-bar and S for larger subgroups and individuals with moving range for single readings. For counts you choose p, np, c or u.
How much does it cost?
Using the studio is free. Exporting the full report costs $79, or you can export one part alone: control charts $19, capability report $39, Gauge R&R report $19, sampling plan $9, improvement summary $5.
Where is my data stored?
Only in your browser. Nothing is sent to a server. Save the data as a JSON file to keep it or to reopen it later.
Are the results the same as Minitab?
For the same data and the same method, yes: control limits, Cp, Cpk, Pp, Ppk and the ANOVA Gauge R&R follow the published formulas. Small differences can come from the choice of sigma estimate (range, standard deviation) or from rounded constants.