Maintenance stores

Spare Parts and Inventory Studio

Paste the parts list from your spreadsheet and get stock levels, a reorder list and the cash you can release. The settings have reference values, so you only supply your own parts, costs and usage.

  • Paste from Excel
  • ABC and demand patterns
  • Reorder point, min and max
  • Dead stock and cash released
  • EN · FR · AR
  1. Your datacompany, sector, figures
  2. Resultsfree, as you type
  3. Report$5 to $19

Loading the studio…

How to use it well

What it does

Classifies every part by value (ABC), demand pattern and criticality, picks a stocking policy, then computes the order quantity, safety stock, reorder point, min and max. It lists what to reorder today and what stock is dead or in excess.

What you need

A list with, for each part, code, description, unit cost, stock on hand and yearly usage. Months with movement and lead time make it sharper. Copy it from your spreadsheet and paste it: no file upload and no template.

Where the data comes from

The method uses standard formulas (economic order quantity, safety stock, Poisson for slow movers). The part-family dictionary and the default criticality of each family were written for this studio. The holding cost default is a published rule-of-thumb range, shown as an assumption. The cost of an order has no default in money: it comes from your own hourly cost or your own figure.

How to get a reliable result

Use a full year of usage, enter real lead times for class A and critical parts, replace the holding cost rate with your own and enter your cost of an order. Check the family and criticality shown for your top parts and correct them.

How to read the report

Start with the findings, then the reorder list. Min is the reorder point; max is where an order brings you back to. Cash that can be released is book value of dead and excess stock.

Limits

Results are only as good as the usage history you paste. Pack sizes, supplier minimum quantities and lead-time spread for slow movers are not modelled. Up to thousands of rows are calculated; only the first 200 are editable on screen.

Questions

How much does it cost?

Using the studio is free. Exporting the report costs 19 USD for the full study, or one part alone: classification 9 USD, stock levels and reorder points 9 USD, dead-stock and savings report 5 USD.

Where is my parts list stored?

Only in your browser. Nothing is uploaded to a server. Save a JSON file to keep a copy or move it to another computer.

Which columns can I paste, and in which language?

Code, description, unit cost, stock, yearly usage, months with movement, lead time and criticality, with or without a header row in English, French or Arabic. Decimal commas, thousands separators and currency symbols are understood.

What if my list has thousands of rows?

All rows are calculated. To keep the page fast, only the first 200 rows are shown for editing; the rest are stored and counted, and the CSV export holds every part.

Can I change the reference values?

Yes. Service levels by criticality, holding cost, ordering cost, lead-time variability, review period, ABC cut-offs and dead-stock months can all be replaced. Any value you leave empty is listed as an assumption in the report. The cost of an order has no reference value in money: without it the order quantity is one month of usage.