From a list of assets to a ranked risk list, a maintenance task for every failure mode and a replacement interval from your own failure data. Everything a reliability analyst builds in a spreadsheet, with a failure-mode library for 17 equipment classes.
Automotive suppliers by process
Own scales, no copied tables
60 industry quick starts
English, French, Arabic
86failure modes written for the library
17equipment classes: pumps, motors, robots, presses, panels, sensors and more
It ranks your assets by consequence and likelihood, builds an FMEA worksheet from a library of failure modes (effect, cause, current control, severity, occurrence, detection, risk priority number and action priority), applies an RCM decision logic that turns each failure mode into a task with an interval, fits Weibull models to failure and running times (shape, scale, B10 life, MTBF, reliability, probability plot, cost-optimal replacement age) and computes MTBF, MTTR and availability from a failure log. It ends with an action plan that shows the risk before and after.
What you need
Pick your industry to load the usual assets and their failure modes, then change names, numbers and roles. For a stronger study add the stoppages of the last year (asset, date, hours lost) and the ages at failure of the parts that matter, with a plus sign for parts still running. Everything else has a default shown in grey.
Where the data comes from
The scales, the 86 failure modes, the rules and the industry quick starts are written by AMAADOR OPEX in its own words. The Weibull and age-replacement arithmetic follows the NIST/SEMATECH e-Handbook and standard textbooks, the RCM logic follows the public consequence-first principles. No table of AIAG-VDA, ISO, OREDA or NPRD is copied. Library lives and shapes are typical orders of magnitude and you can change every one.
How to get a reliable result
Replace the grey consequence scores of your top assets with your own, check the severity of every line that touches safety, and review the library failure modes for your equipment. Type real failure ages: fewer than five failures give only an indicative Weibull fit. Give the cost of an hour of lost output to value the actions in money.
How to read the report
Start with the criticality part: it tells you where to look first. The FMEA part lists the failure modes by action priority. The RCM part gives each one a task type and an interval and totals the labour hours. The Weibull part shows whether age matters and when to replace. The KPI part compares your log with the library. The plan shows the risk before and after the actions.
Limits
It is a desk study, not a certified safety analysis. The action priority is the studio’s own rule, not the AIAG-VDA tables, and customers who require those tables will want the table of their own manual. No confidence bounds are computed for Weibull results, and the library values are not measured data. Have a qualified reliability engineer review decisions on safety functions.
Questions
Which scoring scales does it use?
Severity, occurrence and detection are scored 1 to 10 on scales written by the studio, printed in the report. Occurrence comes from expected failures per year. The action priority is the studio’s own rule. The AIAG-VDA tables are copyrighted and not used.
Can I use my own failure data?
Yes. Type the ages at failure (a plus sign marks a part still running) in a Weibull data set and link it to a failure mode: the shape and life replace the library values. Add the failure log to get your own MTBF, MTTR and availability, which also replace the default likelihood of the asset.
How much does it cost?
Using the studio is free. Exporting the full study costs $79, or you can export one part alone: criticality ranking $9, FMEA worksheet $19, RCM task list $19, Weibull report $19, reliability KPIs $9, action plan $9.
Where is my data stored?
Only in your browser. Nothing is sent to a server. Save the data as a JSON file to keep it or to reopen it next year.
Can the failure-mode library be trusted?
It is a written starting point for 17 equipment classes: effects, causes, controls and typical lives are orders of magnitude from general engineering practice, not measured data from OREDA or a manufacturer. Edit every line for your own machines and have a reliability engineer review it before decisions that touch safety.