Analysis after the shift, without a monitoring system. Enter your machines, shifts and stops, or paste them from a spreadsheet, and the studio shows where the time goes, what it costs and what an improvement would earn.
It turns your shift counts and stop log into OEE, availability, performance and quality for each machine, line, shift and day, draws the loss waterfall from calendar time to valuable operating time, ranks the loss reasons, computes MTBF and MTTR, puts a value on the losses and tests an improvement.
What you need
The ideal cycle time of each machine, and per shift the planned time, the total count, the scrap and the rework. For the reasons, the stops with minutes. Margin per good part and the cost of a downtime hour are optional and only give the money value.
Where the data comes from
Your own log. The reason library, the loss definitions and the improvement methods are written by us around the public six-big-losses idea; no vendor list or standard is copied. Machine templates are illustrations, not measurements.
How to get a reliable result
Use at least two weeks of shifts. Check the ideal cycle time first: if performance is above 100% it is wrong. Give every stop a reason, so little is left as unlogged stops. Read the data-quality score before acting.
How to read the report
Start with the waterfall: it shows how calendar time shrinks to valuable time. Then the Pareto: the top three reasons are where to work. The improvement case tells what a change would earn per year.
Limits
This is analysis after the fact, not live machine monitoring. Results are only as good as the counts and the stop times entered. The 85% target is a common rule of thumb; set your own.
Questions
Is the studio free to use?
Yes. Entering data and seeing the results on screen is free. Exporting the report costs $79 for the full study, or from $5 for a single part.
Where is my data stored?
Only in your browser. Nothing is uploaded. Use Save JSON to keep a copy and Open JSON to come back to it.
Can I paste from Excel or a PLC export?
Yes. Under each table there is a paste box: copy the cells with or without a header row and import. Dates in several formats, decimal commas and times in minutes, hours or seconds are understood.
Why is my performance above 100%?
The ideal cycle time is probably too slow, or the count includes parts from another machine. Correct the cycle time first; the studio flags such shifts.
Does it work for my industry?
There are quick starts for 55 industries, with automotive suppliers specific: press lines, robot welding cells, paint lines, crimping machines, SMT lines, injection presses and assembly lines. You can edit every machine and add your own reason codes.