Permit to work

Permit to Work and Contractor Studio

List the high-risk jobs of the day or of a shutdown. The studio writes one permit per job with its checklists, links the isolation points, finds the jobs that must not run together, scores the contractors and plans lone work, fall rescue and gas testing.

  • 7 permit types
  • LOTO points register
  • SIMOPS clash matrix
  • 60 industry quick starts
  • EN · FR · AR
  1. Your datacompany, sector, figures
  2. Resultsfree, as you type
  3. Report$5 to $79

Loading the studio…

How to use it well

What it does

It turns your list of jobs into a permit register with a filled form per job, isolation plans, a clash check by area and time, contractor prequalification, a lone work plan, a fall clearance check and a gas log.

What you need

The jobs, their area and time, the energy points to lock off, the contractors’ documents, and for falls the heights of the work and the anchor.

Where the data comes from

Limits come from US OSHA rules (public domain) and the EU limit value directive. Checklists, clash rules, scores and talks are written by us in plain words, not copied from any standard.

How to get a reliable result

Give each job its real area and time, list every energy source, answer the contractor criteria from documents you have seen, and use your equipment data for the fall check.

How to read the report

Start with permits on hold and red clashes: they stop the job. Then close the contractor gaps, then print the forms and the talks for the morning briefing.

Limits

It prepares the paperwork; it does not replace the site visit by a competent person, the gas test itself or national law, which may be stricter.

Questions

How much does it cost?

Using the studio and seeing the results is free. Exporting the report costs 79 dollars for the full study, or one part alone from 5 dollars.

Where is my data stored?

Only in your browser. Nothing is sent to a server; save a JSON file to keep or share your work.

Which law does it follow?

You choose the reference set: EU, UK, US, Gulf, North Africa or your own values. Gas limits follow that choice and can be typed over.

How are clashes found?

Two permits in the same area with overlapping times are compared with our rule for that pair of work types.

Can I use it for contractors only?

Yes. The contractor control part can be taken alone for 19 dollars and works with any list of companies.