From a list of machines to a complete maintenance plan: tasks per asset, a week-by-week calendar checked against your team, the spares to stock and a three-year budget in your currency. Then export the work orders as CSV into the system you already use.
44 equipment classes
Automotive suppliers specific
60 industry quick starts
English, French, Arabic
44equipment classes with their own task sheets
381preventive tasks with interval, trade, time and parts
You list the machines of each line. The studio picks the tasks for each one from its library, builds a 52-week calendar by trade, compares it with the hours your team can give, moves jobs to quieter weeks, lists the spares, and prices three years with inflation.
What you need
Only the list of equipment. Pick your industry for a ready list, then edit. Type your team, your shutdown weeks and your own prices when you have them: everything else has a default and the report says which defaults were used.
Where the data comes from
The task library, intervals, times and parts are written by the studio author as generic good practice, not copied from manufacturer manuals or standards. Reference prices and replacement values are indicative and meant to be replaced.
How to get a reliable result
Set criticality honestly, type your real team and shutdown weeks, then check the intervals against your manuals. A and B assets get the deeper plan, so a wrong A costs real hours.
How to read the report
Six parts: register, PM plan, calendar, spares, budget and KPI sheet. In the heat strip red means a week above capacity; the table lists every job the studio moved and why it could move.
Limits
This plans and budgets; it is not a work-order app with phone access. Export the CSV into the CMMS or spreadsheet you already have. It does not predict failures and breakdown work is an estimate from your planned share.
Questions
Does the studio replace my CMMS?
No. It plans and budgets, then exports the plan as CSV with generic columns (asset, task, craft, frequency, planned week and date, hours, parts, cost) that most CMMS tools can import after a column mapping.
Are the intervals from manufacturers?
No. They are generic good practice written for this studio and are all editable in your plan. Where a manufacturer manual or a local regulation is stricter, follow it.
What does it cost?
Using the studio is free. Exporting costs the full price of $79, or one part alone: register $9, PM plan $39, calendar $19, spares $9, budget $19 or KPI sheet $5.
Where is my data stored?
Only in your browser. Nothing is uploaded. Save your study as a JSON file to keep a copy or move to another computer.
Is the cost-to-asset-value range a rule?
No. About 2 to 5% is a figure quoted by practitioners with large differences between sources and industries. The studio shows it as guidance, and it depends on how you value the assets.