Turn any improvement into a decision the board can sign. Build the cash flows of a base case and up to four options, and the studio gives the NPV, IRR, payback, the inputs that matter most, the chance of losing money and a one-page recommendation written from your numbers.
Works in any currency
Up to 4 options side by side
60 industry quick starts
Seeded Monte Carlo in your browser
EN · FR · AR
60industry quick starts, automotive suppliers each specific
17cash-flow line types: capex, installation, working capital, savings, margin, costs, salvage
8report parts, from a $5 assumptions sheet to the risk analysis
3dated central-bank policy rates shown for reference
It appraises an investment end to end: cash flows by option with phasing, escalation, tax and depreciation; NPV, IRR, MIRR, payback, discounted payback, profitability index, equivalent annual gain and life-cycle cost; a tornado on every input; a Monte Carlo simulation; repair or replace; make or buy; cost of quality; and a board paper.
What you need
The investment (price, installation, phasing), the yearly savings or extra margin you expect, the added running costs, and a salvage value. Pick your industry for a quick start with illustrative figures, or load the example, then overwrite with your own numbers.
Where the data comes from
The maths are textbook definitions. The only reference data are three policy rates, with date and source, taken from the central banks themselves, and shown for reference only. Discount rate, inflation, tax and ranges start as generic placeholders: replace them with your finance team’s values.
How to get a reliable result
Use cash, not accounting profit. Count only savings you will really bank. Use contribution margin, not sales, for extra volume. Include training, downtime and extra maintenance. Set the low and high percentages from real quotes and past overruns, then read the tornado to see which figure to firm up first.
How to read the report
Start with the board paper: the recommendation is written from the numbers. A positive NPV with an IRR above your discount rate is good, but check the chance of loss and the P10 bad case. The tornado shows what to measure; the margin of safety shows how wrong the savings can be.
Limits
Cash flows are yearly and at year end; tax losses are credited as if the company has other profit; the simulation draws each line independently; qualitative factors (strategy, safety, brand) are outside the numbers. Not financial, legal or tax advice.
Questions
Does it replace a finance department?
No. It does the arithmetic and the risk simulation quickly and shows its working, so that your finance team can check the assumptions. The discount rate and tax treatment must come from them.
Why is the discount rate not filled by country?
A discount rate is your cost of capital plus a risk premium, not a central bank rate. The studio shows three dated policy rates for reference and starts from a generic value that you replace.
Is the simulation the same each time?
Yes. It uses a seeded random generator, so the same inputs always give the same percentiles. Change the seed to see how stable the answer is.
How much does it cost?
Using the studio on screen is free. Exporting the full study with the data file costs $79; each part can be taken alone from $5 (assumptions sheet) to $39 (risk analysis).
Where is my data stored?
Only in your browser. Nothing is uploaded and the simulation runs on your device. Save a JSON file to keep or move your study.