Put your machines, routings and orders in, and get a finite-capacity schedule with a Gantt chart, the late orders and the bottleneck. Balance an assembly line against takt time, turn stopwatch readings into standard times and draw the value stream with its lead time.
Five dispatching rules compared
Gantt, balance chart and value stream map
60 industry quick starts
Harness, SMT, seats, body shop, assembly
EN · FR · AR
60industry quick starts, with every step of the automotive supply chain
5dispatching rules compared on your orders
35ready plant models: work centres, routings, orders, a line and a value stream
10working-condition allowance classes in the time study
Four tools on one data set. The scheduler loads your orders onto machines with calendars, one rule at a time, and draws the Gantt chart, the late orders and the utilisation of each work centre. The line balancer divides tasks into stations for a given takt time. The time study turns stopwatch readings into standard times. The value stream map draws your steps with inventory and gives the lead time, current and future.
What you need
For the schedule: machines per work centre with shifts, products with their operations (cycle time, pieces per cycle, setup) and orders with quantity and due day. For the balance: tasks with times and what comes before each. For the time study: stopwatch readings per element. For the map: cycle time, changeover, uptime and stock per step. Pick your industry first and every table is filled with typical lines.
Where the data comes from
The maths comes from published methods: forward list scheduling with dispatching rules, ranked positional weight line balancing, the stopwatch sample-size formula, and value stream lead-time arithmetic. The allowance table and every quick-start figure are our own typical values, written for this studio; no licensed predetermined-time table (MTM, MOST) is used.
How to get a reliable result
Replace the quick-start figures with your own: real cycle times, real efficiency, real due dates. Compare the five rules, then test the levers on the bottleneck. Take at least ten stopwatch readings per element and let the studio tell you when more are needed. Keep the value stream steps in flow order and count stock where it really waits.
How to read the report
Start with the late orders and the bottleneck: a work centre above 100% load cannot be saved by sequencing. Then read the what-if table: the lever at the top removes the most lateness. In the balance report, compare the stations with the theoretical minimum. In the time study, trust only elements marked enough. In the map, the lead-time ladder shows where the waiting is.
Limits
The schedule is a good heuristic, not an optimum, and operations do not overlap between machines. It works on a plan of a few hundred orders; it does not read live shop-floor data. Line balancing gives a feasible balance, not always the fewest stations. Allowances are typical values to adapt. Nothing here replaces a measured study on your own floor.
Questions
Is it free to use?
Using the studio is free: enter your data and see the results as you type. Exporting the report costs $79 for the full study, or one part alone: $19 for the schedule, $9 for late orders, $19 for the line balance, $9 for the time study, $19 for the value stream pack, $9 for what-if and actions.
Where is my data stored?
Only in your browser. Nothing is sent to a server. Use Save JSON to keep a copy and Open JSON to come back to it on another device.
Does it find the best possible schedule?
No. It uses the dispatching rules that planners rely on and compares five of them on your orders, then tests levers on the bottleneck. That gives a good, explainable schedule quickly. Proving the optimum needs a specialised solver and is rarely worth it on a real floor.
Can I use my own allowances and rating?
Yes. Personal needs, fatigue and delays are fields you set, the working-condition allowance is chosen per element, and the rating is typed for each element. The built-in table is only a typical starting point.
Does it include the automotive supply chain?
Yes. Quick starts exist for vehicle assembly, stamping and body structure, paint, powertrain, casting, plastic injection, seats and trim, wiring harness with assembly boards, electronic cards with the SMT line, batteries, rubber, glass and repair, each with its real process steps.