Routine · 13 tools

Start of shift

Handover, safety and readiness checks before the line runs.

$2ChecklistStart-of-shift machine checkA short check before running: guards and safety devices, condition, utilities and documents. Record any abnormality before the first cycle.$3ChecklistStart-of-shift machine checklistOperator check before running a machine: guards, emergency stops, leaks, levels, cleanliness and first-cycle behaviour. Add your own items per asset.$5TemplateShift handover generatorBuild a structured shift handover for a line or area: safety first, then status, open issues, actions and what the next team must watch.$3RegisterShift Handover Log GeneratorFree shift handover log generator in English, French and Arabic. Record safety, production against plan, quality holds, equipment, permits and LOTO…$3BoardStart-of-shift huddle (Tier 1)A 10–15 minute stand-up at the team board: safety, quality, delivery, people, then problems and actions. Problems the team cannot solve go to Tier 2.$5TemplateTier 1 huddle boardA printable A3/A4 board for the 10-minute team huddle: safety, quality, delivery, cost and people, with a 7-day track and an escalation log to Tier 2.$3BoardToolbox talk boardA 5–10 minute safety talk at the start of work: one topic, questions from the team, and actions from what they raise.$2ChecklistForklift pre-use checkA daily check before a forklift is used. Any critical fault takes the truck out of service until repaired; the team leader controls the record.$2ChecklistVehicle pre-trip inspectionA walk-around check before the vehicle leaves. A critical defect means the vehicle does not leave until it is repaired.$2ChecklistLine clearanceBefore a new batch or product, confirm the line holds nothing from the previous run: product, components, labels or documents.$2ChecklistFirst-piece / first-off checkConfirm the first part after a start-up, changeover or repair meets the drawing before running the batch.$2ChecklistMaterial availability checkBefore releasing an order, confirm every component on the bill of materials is in stock, released by quality and at the line in time.$2Calculator24/7 shift staffing: FTE and crews neededEnter operating hours, positions to fill, contract hours and shrinkage (absence, leave, training).

Other routines

During the shift12 toolsTrack output, walk the floor and catch problems while they are small.End of shift7 toolsClose the work, record what happened and hand over cleanly.Every week13 toolsPlan the week, check compliance and review losses.Every month15 toolsKPI packs, budget and management reviews.When something goes wrong12 toolsBreakdown, defect or incident: contain it, find the cause, close it.Before a risky job11 toolsPermits, isolation and risk checks before non-routine work.Planning an improvement10 toolsCharter the project, size the gain and validate the savings.